FTA rate comparison

Enter HS code, origin and import date to compare ordinary, MFN and relevant FTA schedules.

7610.90.91 · — Not selected — · 18 Nov 2026

Aluminium structures (excluding prefabricated buildings of heading 94.06) and parts of structures (for example, bridges and bridge-sections, towers, lattice masts, roofs, roofing frameworks, doors and windows and their frames and thresholds for doors, balustrades, pillars and columns); aluminium plates, rods, profiles, tubes and the like, prepared for use in structures / - Other: / - - Other: / - - - Bridges and bridge-sections; towers or lattice masts

Tariff schemePublished ratePotentially applicable rateBelow MFN (pts)EligibilityRecommendationData basis
Ordinary import duty22.5% 22.5%—When MFN conditions are not metBT2026
MFN15% 15%—Applies to WTO/MFN partnersBT2026
AANZFTA 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
2022 - 2027 (một mức cho cả giai đoạn)
ACFTA 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
2022 - 2027 (một mức cho cả giai đoạn)
AJCEP 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
01/4/2026 - 31/3/2027
AKFTA 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
2022 - 2027 (một mức cho cả giai đoạn)
ATIGA 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
2026
CPTPP 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
(VI)
VCFTA 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
2026
VJEPA 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
01/4/2026 - 31/3/2027
VKFTA 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
2026
VN-EAEU 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
2026
VN-LAO 0% 0% 15.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
AIFTA 1% 1% 14.00 Eligibility Not Verified Documentation Required Consolidated BT2026
01/01/2026 - 31/12/2026
EVFTA 1.8% 1.8% 13.20 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
UKVFTA 1.8% 1.8% 13.20 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
VIFTA 6% 6% 9.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
RCEP (Annex A) 10% 10% 5.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
RCEP (Annex B) 10% 10% 5.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
RCEP (Annex E) 10% 10% 5.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
RCEP (Annex F) 10% 10% 5.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
RCEP (Annex D) 10.3% 10.3% 4.70 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
RCEP (Annex C) 15% 15% 0.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
VN-CAM No data No data — Eligibility Not Verified Eligibility Not Confirmed No data
VNCU No data No data — Eligibility Not Verified Eligibility Not Confirmed No data
AHKFTA * not eligible Not eligible (*) — Eligibility Not Verified Not Applicable Consolidated BT2026
2026

"Published rate" comes from the source tariff. "Potentially applicable rate" is the numeric value after country exclusions; FTA eligibility always remains unverified.

Run Smart Tariff Advisory