FTA rate comparison

Enter HS code, origin and import date to compare ordinary, MFN and relevant FTA schedules.

8703.60.58 · — Not selected — · 19 Nov 2026

Motor cars and other motor vehicles principally designed for the transport of persons (other than those of heading 87.02), including station wagons and racing cars / - Other vehicles, with both spark-ignition internal combustion piston engine and electric motor as motors for propulsion, capable of being charged by plugging to external source of electric power: / - - Other: / - - - Motor-homes: / - - - - Of a cylinder capacity exceeding 2,000 cc

Tariff schemePublished ratePotentially applicable rateBelow MFN (pts)EligibilityRecommendationData basis
Ordinary import duty105% 105%—When MFN conditions are not metBT2026
MFN70% 70%—Applies to WTO/MFN partnersBT2026
ATIGA 0% 0% 70.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
2026
VN-EAEU 0% 0% 70.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
2026
VN-LAO 0% 0% 70.00 Eligibility Not Verified Lowest Published Rate Consolidated BT2026
VCFTA 8% 8% 62.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
AANZFTA 33.3% 33.3% 36.70 Eligibility Not Verified Documentation Required Consolidated BT2026
2022 - 2027 (một mức cho cả giai đoạn)
ACFTA 50% 50% 20.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2022 - 2027 (một mức cho cả giai đoạn)
RCEP (Annex A) 70% 70% 0.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
RCEP (Annex B) 70% 70% 0.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
RCEP (Annex C) 70% 70% 0.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
RCEP (Annex F) 70% 70% 0.00 Eligibility Not Verified Documentation Required Consolidated BT2026
2026
CPTPP 25,4/23,5; M: 31,8/29,3 Needs interpretation — Eligibility Not Verified Eligibility Not Confirmed Consolidated BT2026
(VI)
EVFTA 26,9 / 22,2 (several rates) Needs interpretation — Eligibility Not Verified Eligibility Not Confirmed Consolidated BT2026
2026
UKVFTA 26,9 / 22,2 (several rates) Needs interpretation — Eligibility Not Verified Eligibility Not Confirmed Consolidated BT2026
2026
VN-CAM No data No data — Eligibility Not Verified Eligibility Not Confirmed No data
VNCU No data No data — Eligibility Not Verified Eligibility Not Confirmed No data
VKFTA 75.3% 75.3% -5.30 Eligibility Not Verified No Saving vs MFN Consolidated BT2026
2026
AHKFTA * not eligible Not eligible (*) — Eligibility Not Verified Not Applicable Consolidated BT2026
2026
AIFTA * not eligible Not eligible (*) — Eligibility Not Verified Not Applicable Consolidated BT2026
01/01/2026 - 31/12/2026
AJCEP * not eligible Not eligible (*) — Eligibility Not Verified Not Applicable Consolidated BT2026
01/4/2026 - 31/3/2027
AKFTA * not eligible Not eligible (*) — Eligibility Not Verified Not Applicable Consolidated BT2026
2022 - 2027 (một mức cho cả giai đoạn)
RCEP (Annex D) * not eligible Not eligible (*) — Eligibility Not Verified Not Applicable Consolidated BT2026
2026
RCEP (Annex E) * not eligible Not eligible (*) — Eligibility Not Verified Not Applicable Consolidated BT2026
2026
VJEPA * not eligible Not eligible (*) — Eligibility Not Verified Not Applicable Consolidated BT2026
01/4/2026 - 31/3/2027
VIFTA * not eligible Not eligible (*) — Eligibility Not Verified Not Applicable Consolidated BT2026
2026

"Published rate" comes from the source tariff. "Potentially applicable rate" is the numeric value after country exclusions; FTA eligibility always remains unverified.

Run Smart Tariff Advisory